We have several VDP 6.1 instances in our environment and each one has 2-3 backup jobs and one replication job each. The backups run nightly, but I need to tune it so that Mondays are skipped due to another maintenance going on, but I don't see a way to do that in VDP. The only option I see is to disable each of the backups manually every Monday so they don't run, and then re-enable them again on Tuesday, which is a PITA. Any suggestions on how to do this? Thanks.
↧